Design and construction of a distillery

Design and construction of a distillery

1017578
Price netto:
$133.09
Ukraine: Pre-order only
Poland: Pre-order only
Germany: Pre-order only
1017578
We deliver anywhere in the world

Features Design and construction of a distillery

Producer
BTS Engineering
Post-alcohol processing bards
yes
Consumption of fossil fuels, nm3/liter (on the example of natural gas)
0,2 – 0,32
Raw
grain crops, molasses, stream
Type
service
Consumption of circulating water, m3/liter (at the exit of the cooling tower 20˚C)
0,2
Productivity, liter/day
5000–100000
Artesian water, m3/liter
0,002
Electricity consumption, kW/liter
0,5
The presence of ACS TP
yes
All features

Description

Alcohol, bioethanol, construction of distilleries, bioethanol plants, alternative fuels production plants, ethanol production plants, design of distilleries, design of bioethanol production plants. The design and construction of a plant for the production of alcohol (ethyl alcohol, ethanol) can be divided into the following successive stages: * Pre-project work • Project development * Project expertise * Obtaining permission to start construction • Construction • Commissioning • Production certification • Production output pre-project work Pre-project work includes * Development of technical specifications (customer + designer) * Obtaining urban planning conditions and restrictions on the site; * Obtaining technical specifications for the connection of energy carriers. * Obtaining a technical specification for the production of bioethanol (purchase) * Development of regulations for the production of bioethanol Project development The design of the object of the class of consequences of SS3 is carried out in three stages 1. Feasibility study stage (feasibility study) 2. Stage P (project) 3. Stage W (working documentation) project expertise It is carried out in a specialized organization that has a permit for the examination of projects with the CC3 impact class. Stage P is submitted for examination. Obtaining a permit to start construction takes place in DABI after receiving a positive expert opinion. Construction Construction can be divided into several stages: * Preparatory work • General construction works * Installation of process equipment * Landscaping

Video Design and construction of a distillery

Reviews (0)

To add a review please sign up or login
Good price
0
Please select the language