Multistage pump for water treatment EVXE 15/7, 7.5 kW, 24 m3/h, 103m, 380V/T, AISI 304 (EBARA EVM)

Multistage pump for water treatment EVXE 15/7, 7.5 kW, 24 m3/h, 103m, 380V/T, AISI 304 (EBARA EVM)

ST Pompe
Brand
1051392
Price netto:
$1,857
Warehouse Ukraine: Pre-order only
Warehouse Poland: Pre-order only
Warehouse Germany: Pre-order only
Warehouse Italy: Pre-order only
1051392
Buy in 1 click
We deliver anywhere in the world

Features Multistage pump for water treatment EVXE 15/7, 7.5 kW, 24 m3/h, 103m, 380V/T, AISI 304 (EBARA EVM)

Producer
ST Pompe
Type of configuration
with engine
Serial number of the pump
EVXE
Pump capacity, m3/h
24
Feed height, m
103
Power capacity, kW
7,5
Material
AISI 304 stainless steel
Input pipe diameter
DN50
Output pipe diameter
DN50
Max. head, m
103
All features

Description

The vertical multistage pumps of the EVXE series are suitable for various applications, mainly in industry and construction (boiler feed, hot and cold water circulation for heating/cooling/air conditioning systems, pressure boosting and water supply systems, washing plants, water treatment plants, etc.). All parts of the pump in contact with the liquid are made of AISI 304 stainless steel (AISI 316 on request). The professional vertical multistage pumps have simple in-line installation, as well as easy dismantling and maintenance.

Documentation Multistage pump for water treatment EVXE 15/7, 7.5 kW, 24 m3/h, 103m, 380V/T, AISI 304 (EBARA EVM)

Download instructions, catalog for Multistage pump for water treatment EVXE 15/7, 7.5 kW, 24 m3/h, 103m, 380V/T, AISI 304 (EBARA EVM)

Reviews (0)

To add a review please sign up or login
Also buy with this product
Price:
$141
In stock
- +
Price:
$325
In stock
- +
Price:
$328
In stock
- +
Price:
$174
In stock
- +
Price:
$117
In stock
- +
Price:
$319
In stock
- +
Price:
$339
In stock
- +
Price:
$232
In stock
- +
Price:
$345
In stock
- +
Price:
$1,323
In stock
- +
Price:
$356
In stock
- +
Price:
$575
In stock
- +
Price:
$477
Pre-order only
- +
0
Contact us