After the completion of the design work and obtaining a building permit, the installation work of the equipment of the distilleries is carried out. A specialized company usually carries out installation work.
The BTS ENGINEERING Company carries out installation supervision and commissioning of equipment for distilleries, technological systems and cycles; designer supervision at the stage of equipment manufacturing and construction and installation works; experimental operation and technological support after achieving optimal performance of the equipment and commissioning of the enterprise.