BTS Engineering Company together with engineers and technologists of the plant carried out a number of works on the design, manufacture and replacement of the brew column at the distillery with a capacity of 3000 dal per day. The economic effect of replacing the double-boiling column with a modern column designed by BTS Engineering engineers amounted to savings in energy consumption of 1000 m3 of gas per day. The second stage is recuperation on distillation system-heating of the mash column with steam. effect-saving 15-19 kg of steam per 1dal of product. That in monetary terms will be about 800 thousand dollars a year